The construction of the plant panel-frame wooden construction

Project nameThe construction of the plant panel-frame wooden construction
Industry classificationManufacturing industry
Basic information about the project
Project essenceThe construction of the plant panel-frame wooden construction versatile industrial complex which will produce elements for the installation of panel-frame houses.
Project capacitySet of wall panels - 10000 sq. m, carton house for finishing with the Foundation and roof - 6000 sq. m, turnkey engineering services, Windows, exterior wall finish, interior trim - 3200 sq. m.
Consumer market descriptionOrdinary ordinary consumers, average and above average income of the Firms, sale and installation of houses, for people who want to get a house under the key. Investors wishing to arrange land, more affordable housing , for fast arrangement, and more
Object construction term1.00
Competitive advantageHave good thermal insulation properties, which allows owners to save on heating, are not subject to shrinkage, therefore, immediately after completion of construction to bring utilities and wiring. The house, made on frame technology, very "light", so they do not require expensive buried foundations. Unlike brick, timber and log houses, timber frame is easy to change planning decisions, as in the construction phase and during subsequent operation.
Resource availability for project realizationThe project will provide all necessary resources
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh3800.00
Planned volume of gas consumption (annual), million cubic meters0.00
Planned volume of water consumption (annual), million cubic meters0.30
Degree of project developmentBusiness plan
Financial estimation of the project
Total cost of the project, mln rubles141.00
Own resources, million rubles141.00
Means of regional (municipal) budget, million rubles0.00
Previously involved means, million rubles0.00
Investment capacity, mln rubles141.00
Conditions of investor participationDirect investments
Form of investments returnMoney
Payback period3.25
Basic indicators of investment project economic efficiency
Net present value (NPV)21.69
Simple payback time3.25
Discounted payback period5
Internal rate of return (IRR)43.7
Productivity index (PI)1.1
Income per year 219.8
Social efficiency of investment project
Number of workplaces29
Salary average level (thousand rub per year)348
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles1.30
which includes into consolidated budget of the krai, million rubles1.04
General information about the ground area
Address of the areaLandmark Korenovsk, str Sizonenko, 3
Cadastre account of ground areaNot registered
Cadastre number of area/of quarter23:12:0608000
Declared area (m2)290000.00
Limit size of the area (m2)290000.00
Land categoryLands of inhabited localities
Kind of allowed useProduction
Actual usearable land
Availability of buildings, structures, constructionsnone
Permits, town-planning documentationThe General plan korenovsky urban settlement korenovsky area, approved by the Council korenovsky urban settlement korenovsky area of 20 September 2010 № 111 "On approval of the General plan korenovsky urban settlement Korenovsky district" (as amended
Information about proprietor (right holder)
ProprietorState (not delimited) property
Right holderAdministration Korenovskaya urban settlement
Kind of rightAnother
Information about encumbrance and limitation
Kind of encumbrance, limitationnone
Encumbrance area0.00
Electricity supply
Power supply center (name, right-holder)Public joint stock company "Kubanenergo"
Power supply center (electrotension class)Middle class of tension – from 1 kV to 35 kV
Power supply center (free power (MWt)).00
Power supply center (distance(m))760.00
Nearest connection point (network tension, kV).00
Nearest connection point (distance(m))760.00
Gas-supplying
Gas pipeline (name, right-holder)Joint-stock company "Korenovskraigaz"
Gas pipeline (diameter(mm)).00
Gas pipeline (pressure(MPa))Average pressure pipelines – from 0,005 to 0,3
Gas pipeline (carrying capacity(cube. m.in a year)).00
Gas pipeline (distance(m))760.00
Nearest connection point (diameter(mm)).00
Nearest connection point (carrying capacity (cubic meter a year)).00
Nearest connection point (distance(m))760.00
Water-supply
Water supply source (name, right-holder)municipal unitary enterprise Housing and communal services
Water supply source (power (cubic meters a day))250.00
Water supply source (quality of water)Drinking water
Water supply source (distance(m))760.00
Nearest connection point (power (cubic meters a day)).00
Nearest connection point (diameter(mm)).00
Nearest connection point (distance(m))760.00
Sewage system
Type of building (name, right-holder)septic tank
Type of building (power (cubic meters a day)).00
Type of building (distance(m)).00
Nearest point of connection (power (cubic meters a day)).00
Nearest point of connection (diameter(mm)).00
Nearest point of connection (distance(m)).00
Installation of telephones/internet
Central network (distance(m)).00
Mobile communication (distance(m)).00
Rated price of the ground area supplying with engineering, mln.rub10.00
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation Korenovsk City3.90
nearest settlement in the precincts of the village.00
Center of federal subject Krasnodar city67.00
highways (regional, federal value) M4 DON2.60
highways of local value Frunze street1.00
nearest railway station Korenovsk Station5.06
nearest railway Korenovsk Station5.06
airport Krasnodar airport66.00
seaport seaport Novorossiysk230.00
Additional information about the ground area
Special conditionsSeismicity is 7 grades
Cost of rent/buy of the ground area, mln. rub.00
Geographical coordinates of object (dd.dddddd)
Latitude (N)45.45733500
Longitude (E)39.41215100
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameAdministration of Korenovsky district
Postal address353180 Korenovsk, Krasnaya, 41
Sitewww.Korenovsk.ru
Phone/faxPhone / Fax: 42 4 8861 14 08
E-mail addresskornienko.alek2015@yandex.ru
Data about the applicant (executive authority/local government executive authority)
NameAdministration of Korenovsky district
Postal address353180, Korenovsky district. Korenovsk, Krasnaya street, 41 Phone /fax 8-(86142) 4-14-08/4-46-06, E-mail: admr@korenovsk.ru Site: www.invest.korenovsk.ru Department of investments and design support of Krasnodar territory 350014, Krasnodar, Kras
Sitewww.Korenovsk.ru
Phone/faxPhone / Fax: 42 4 8861 14 08
E-mail addresskornienko.alek2015@yandex.ru
Executive (Full name, work position, phone number)A.S Kornienko 4-48-59