The construction of the plant for the production of Agropoli for the introduction of innovative technologies of cultivation of cultural plants in open ground

Project nameThe construction of the plant for the production of Agropoli for the introduction of innovative technologies of cultivation of cultural plants in open ground
Industry classificationManufacturing industry
Basic information about the project
Project essenceThe construction of the plant for the production of Agropoli for the introduction of innovative technologies of cultivation of cultural plants in open ground
Project capacityAgropoli Plantation, 120 thousand pieces, Agropoli Bakhcha-universal, 120 thousand pieces, Agropoli Strawberry, 240 thousand PCs., Agropoli Tulip 120 thousand. Agropoli Garlic, 240 thousand PCs, Agropoli Miniport, 120 thousand pieces, Agropoli Miniport the flap 120 thousand.
Consumer market descriptionrural residents, and crop farming, gardeners, farmers.
Object construction term1.00
Competitive advantageNo need in the manufacture and installation of greenhouses, greenhouses. To minimize weeding (burning weeds by heating the soil by solar radiation, without the use of chemical soil treatment). Minimize watering (no loss of moisture from evaporation from the soil surface, the natural flow of water (rain, condensation) to the plant roots. No need to open or close the greenhouses in the hot season during the day. Easy Assembly/dismantling, storage and use of panels.
Resource availability for project realizationThe project will provide resources
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh16.00
Planned volume of gas consumption (annual), million cubic meters0.00
Planned volume of water consumption (annual), million cubic meters7.00
Degree of project developmentBusiness plan
Financial estimation of the project
Total cost of the project, mln rubles270
Own resources, million rubles270
Means of regional (municipal) budget, million rubles0.00
Previously involved means, million rubles0.00
Investment capacity, mln rubles270.00
Conditions of investor participationDirect investments
Form of investments returnMoney
Payback period3.25
Basic indicators of investment project economic efficiency
Net present value (NPV)55.2
Simple payback time3.25
Discounted payback period4.5
Internal rate of return (IRR)52.1
Productivity index (PI)1.1
Income per year 384
Social efficiency of investment project
Number of workplaces16
Salary average level (thousand rub per year)228
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles0.47
which includes into consolidated budget of the krai, million rubles0.38
General information about the ground area
Address of the areaLandmark Korenovsk, str Puruchina
Cadastre account of ground areaNot registered
Cadastre number of area/of quarter23:12:0601018
Declared area (m2)40000.00
Limit size of the area (m2)40000.00
Land categoryLands of inhabited localities
Kind of allowed useProduction
Actual usenone
Availability of buildings, structures, constructionsnone
Permits, town-planning documentationThe General plan korenovsky urban settlement korenovsky area, approved by the Council korenovsky urban settlement korenovsky area of 20 September 2010 № 111 "On approval of the General plan korenovsky urban settlement korenovsky district
Information about proprietor (right holder)
ProprietorState ownership (not demarcated)
Right holderAdministration of Korenovsky urban settlement
Kind of rightAnother
Information about encumbrance and limitation
Kind of encumbrance, limitationnone
Encumbrance area0.00
Electricity supply
Power supply center (name, right-holder)Public joint stock company "Kubanenergo"
Power supply center (electrotension class)Middle class of tension – from 1 kV to 35 kV
Power supply center (free power (MWt)).00
Power supply center (distance(m))450.00
Nearest connection point (network tension, kV).00
Nearest connection point (distance(m))450.00
Gas-supplying
Gas pipeline (name, right-holder)Joint-stock company "Korenovskraigaz"
Gas pipeline (diameter(mm)).00
Gas pipeline (pressure(MPa))Average pressure pipelines – from 0,005 to 0,3
Gas pipeline (carrying capacity(cube. m.in a year)).00
Gas pipeline (distance(m))450.00
Nearest connection point (diameter(mm))0.00
Nearest connection point (pressure (MPa))Average pressure pipelines – from 0,005 to 0,3
Nearest connection point (carrying capacity (cubic meter a year)).00
Nearest connection point (distance(m))450.00
Water-supply
Water supply source (name, right-holder)municipal unitary enterprise Housing and communal services
Water supply source (power (cubic meters a day))250.00
Water supply source (quality of water)Drinking water
Water supply source (distance(m))450.00
Nearest connection point (power (cubic meters a day))0.00
Nearest connection point (diameter(mm))0.00
Nearest connection point (distance(m))450.00
Sewage system
Type of building (name, right-holder)septic tank
Type of building (power (cubic meters a day))0.00
Type of building (distance(m))0.00
Nearest point of connection (power (cubic meters a day))0.00
Nearest point of connection (diameter(mm))0.00
Nearest point of connection (distance(m))0.00
Installation of telephones/internet
Central network (distance(m))0.00
Mobile communication (distance(m))0.00
Rated price of the ground area supplying with engineering, mln.rub10.00
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation Korenovsk City3.80
nearest settlement in the city0.00
Center of federal subject Krasnodar city67.00
highways (regional, federal value) M4 DON7.70
highways of local value St. Purachina0.10
nearest railway station Korenovsk Station2.40
nearest railway Korenovsk Station2.40
airport Krasnodar airport66.00
seaport seaport Novorossiysk230.00
Additional information about the ground area
Special conditionsSeismicity is 7 grades
Cost of rent/buy of the ground area, mln. rub0.00
Geographical coordinates of object (dd.dddddd)
Latitude (N)45.47985900
Longitude (E)39.47403600
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full name353180, Korenovsky district. Korenovsk, Krasnaya street, 41 Phone /fax 8-(86142) 4-14-08/4-46-06, E-mail: admr@korenovsk.ru Site: www.invest.korenovsk.ru Department of investments and design support of Krasnodar territory 350014, Krasnodar, Kras
Postal address353180 Korenovsk, Krasnaya, 41
Sitewww.Korenovsk.ru
Phone/faxPhone / Fax: 42 4 8861 14 08
E-mail addresskornienko.alek2015@yandex.ru
Data about the applicant (executive authority/local government executive authority)
Name353180, Korenovsky district. Korenovsk, Krasnaya street, 41 Phone /fax 8-(86142) 4-14-08/4-46-06, E-mail: admr@korenovsk.ru Site: www.invest.korenovsk.ru Department of investments and design support of Krasnodar territory 350014, Krasnodar, Kras
Postal address353180, Korenovsky district. Korenovsk, Krasnaya street, 41 Phone /fax 8-(86142) 4-14-08/4-46-06, E-mail: admr@korenovsk.ru Site: www.invest.korenovsk.ru Department of investments and design support of Krasnodar territory 350014, Krasnodar, Kras
SiteWebsite: www.Korenovsk.ru
Phone/faxPhone / Fax: 42 4 8861 14 08
E-mail addresskornienko.alek2015@yandex.ru