Project name | The construction of the plant for the production of Agropoli for the introduction of innovative technologies of cultivation of cultural plants in open ground |
Industry classification | Manufacturing industry |
Basic information about the project |
---|
Project essence | The construction of the plant for the production of Agropoli for the introduction of innovative technologies of cultivation of cultural plants in open ground |
Project capacity | Agropoli Plantation, 120 thousand pieces, Agropoli Bakhcha-universal, 120 thousand pieces, Agropoli Strawberry, 240 thousand PCs., Agropoli Tulip 120 thousand. Agropoli Garlic, 240 thousand PCs, Agropoli Miniport, 120 thousand pieces, Agropoli Miniport the flap 120 thousand. |
Consumer market description | rural residents, and crop farming, gardeners, farmers. |
Object construction term | 1.00 |
Competitive advantage | No need in the manufacture and installation of greenhouses, greenhouses. To minimize weeding (burning weeds by heating the soil by solar radiation, without the use of chemical soil treatment). Minimize watering (no loss of moisture from evaporation from the soil surface, the natural flow of water (rain, condensation) to the plant roots. No need to open or close the greenhouses in the hot season during the day. Easy Assembly/dismantling, storage and use of panels. |
Resource availability for project realization | The project will provide resources |
Planned volume of resource consumption (annual) |
---|
Planned volume of electricity consumption (annual), MWh | 16.00 |
Planned volume of gas consumption (annual), million cubic meters | |
Planned volume of water consumption (annual), million cubic meters | 7.00 |
Degree of project development | Business plan |
Financial estimation of the project |
---|
Total cost of the project, mln rubles | 270 |
Own resources, million rubles | 270 |
Means of regional (municipal) budget, million rubles | |
Previously involved means, million rubles | |
Investment capacity, mln rubles | 270.00 |
Conditions of investor participation | Direct investments |
Form of investments return | Money |
Payback period | 3.25 |
Basic indicators of investment project economic efficiency |
---|
Net present value (NPV) | 55.2 |
Simple payback time | 3.25 |
Discounted payback period | 4.5 |
Internal rate of return (IRR) | 52.1 |
Productivity index (PI) | 1.1 |
Income per year | 384 |
Social efficiency of investment project |
---|
Number of workplaces | 16 |
Salary average level (thousand rub per year) | 228 |
Budgetary efficiency of investment project |
---|
Mid-annual tax payments, million rubles | 0.47 |
which includes into consolidated budget of the krai, million rubles | 0.38 |
General information about the ground area |
---|
Address of the area | Landmark Korenovsk, str Puruchina |
Cadastre account of ground area | Not registered |
Cadastre number of area/of quarter | 23:12:0601018 |
Declared area (m2) | 40000.00 |
Limit size of the area (m2) | 40000.00 |
Land category | Lands of inhabited localities |
Kind of allowed use | Production |
Actual use | none |
Availability of buildings, structures, constructions | none |
Permits, town-planning documentation | The General plan korenovsky urban settlement korenovsky area, approved by the Council korenovsky urban settlement korenovsky area of 20 September 2010 ¹ 111 "On approval of the General plan korenovsky urban settlement korenovsky district |
Information about proprietor (right holder) |
---|
Proprietor | State ownership (not demarcated) |
Right holder | Administration of Korenovsky urban settlement |
Kind of right | Another |
Information about encumbrance and limitation |
---|
Kind of encumbrance, limitation | none |
Encumbrance area | |
Electricity supply |
---|
Power supply center (name, right-holder) | Public joint stock company "Kubanenergo" |
Power supply center (electrotension class) | Middle class of tension – from 1 kV to 35 kV |
Power supply center (free power (MWt)) | |
Power supply center (distance(m)) | 450.00 |
Nearest connection point (network tension, kV) | |
Nearest connection point (distance(m)) | 450.00 |
Gas-supplying |
---|
Gas pipeline (name, right-holder) | Joint-stock company "Korenovskraigaz" |
Gas pipeline (diameter(mm)) | |
Gas pipeline (pressure(MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
Gas pipeline (carrying capacity(cube. m.in a year)) | |
Gas pipeline (distance(m)) | 450.00 |
Nearest connection point (diameter(mm)) | |
Nearest connection point (pressure (MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
Nearest connection point (carrying capacity (cubic meter a year)) | |
Nearest connection point (distance(m)) | 450.00 |
Water-supply |
---|
Water supply source (name, right-holder) | municipal unitary enterprise Housing and communal services |
Water supply source (power (cubic meters a day)) | 250.00 |
Water supply source (quality of water) | Drinking water |
Water supply source (distance(m)) | 450.00 |
Nearest connection point (power (cubic meters a day)) | |
Nearest connection point (diameter(mm)) | |
Nearest connection point (distance(m)) | 450.00 |
Sewage system |
---|
Type of building (name, right-holder) | septic tank |
Type of building (power (cubic meters a day)) | |
Type of building (distance(m)) | |
Nearest point of connection (power (cubic meters a day)) | |
Nearest point of connection (diameter(mm)) | |
Nearest point of connection (distance(m)) | |
Installation of telephones/internet |
---|
Central network (distance(m)) | |
Mobile communication (distance(m)) | |
Rated price of the ground area supplying with engineering, mln.rub | 10.00 |
Distance to the large settlements and objects of a transport infrastructure |
---|
Remoteness from | Name | Distance (km) |
---|
center of municipal formation | Korenovsk City | 3.80 |
nearest settlement | in the city | |
Center of federal subject | Krasnodar city | 67.00 |
highways (regional, federal value) | M4 DON | 7.70 |
highways of local value | St. Purachina | 0.10 |
nearest railway station | Korenovsk Station | 2.40 |
nearest railway | Korenovsk Station | 2.40 |
airport | Krasnodar airport | 66.00 |
seaport | seaport Novorossiysk | 230.00 |
Additional information about the ground area |
---|
Special conditions | Seismicity is 7 grades |
Cost of rent/buy of the ground area, mln. rub | |
Geographical coordinates of object (dd.dddddd) |
---|
Latitude (N) | 45.47985900 |
Longitude (E) | 39.47403600 |
Data on the project initiator (in case of existence information about the legal/physical person) |
---|
Name / Full name | 353180, Korenovsky district. Korenovsk, Krasnaya street, 41 Phone /fax 8-(86142) 4-14-08/4-46-06, E-mail: admr@korenovsk.ru Site: www.invest.korenovsk.ru Department of investments and design support of Krasnodar territory 350014, Krasnodar, Kras |
Postal address | 353180 Korenovsk, Krasnaya, 41 |
Site | www.Korenovsk.ru |
Phone/fax | Phone / Fax: 42 4 8861 14 08 |
E-mail address | kornienko.alek2015@yandex.ru |
Data about the applicant (executive authority/local government executive authority) |
---|
Name | 353180, Korenovsky district. Korenovsk, Krasnaya street, 41 Phone /fax 8-(86142) 4-14-08/4-46-06, E-mail: admr@korenovsk.ru Site: www.invest.korenovsk.ru Department of investments and design support of Krasnodar territory 350014, Krasnodar, Kras |
Postal address | 353180, Korenovsky district. Korenovsk, Krasnaya street, 41 Phone /fax 8-(86142) 4-14-08/4-46-06, E-mail: admr@korenovsk.ru Site: www.invest.korenovsk.ru Department of investments and design support of Krasnodar territory 350014, Krasnodar, Kras |
Site | Website: www.Korenovsk.ru |
Phone/fax | Phone / Fax: 42 4 8861 14 08 |
E-mail address | kornienko.alek2015@yandex.ru |